Design basis
The foundation should follow the structural and building-control information appropriate to the project.
Foundation work begins with the load, ground and nearby constraints, not with a standard trench depth copied from another property.
Photos, drawings or a short description can help explain the current condition.
Trees, drains, made ground, neighbouring structures and water conditions can all alter the approach. Setting out and inspection are as important as the concrete itself.
The foundation should follow the structural and building-control information appropriate to the project.
Depth, soil and weather affect safe working and the risk of trench collapse or water ingress.
Formation cleanliness, level, access and pour planning should be ready before concrete is ordered.
No. Ground, trees, drainage and load vary by site, and requirements can change after excavation exposes actual conditions.
Where building control applies, the relevant inspector normally needs to see excavations at the required stage before concrete is placed.
Only where their position, dimensions, condition and capacity are properly established for the new design.
Good site preparation protects access, neighbours, existing property and the programme before the main construction work begins.
Explore site preparationExcavation work needs a defined depth, safe method, material plan and understanding of what may lie below the surface.
Explore excavationDrainage work is about levels, capacity, access for maintenance and a lawful destination for water or waste.
Explore drainage groundworksExtension setting-out, foundations, drainage and finished floor levels begin in the ground.
Formation, sub-base and drainage determine how a driveway performs below its surface.
Explain what the ground must support and any known access, level, drainage or excavation constraints.