Underground risk
Service information, inspection and detection reduce the chance of striking live or important infrastructure.
Excavation work needs a defined depth, safe method, material plan and understanding of what may lie below the surface.
Photos, drawings or a short description can help explain the current condition.
Digging is straightforward only when access, services, ground stability, groundwater and disposal have already been considered. Unexpected material can quickly affect both time and cost.
Service information, inspection and detection reduce the chance of striking live or important infrastructure.
Clean soil, mixed demolition material and contaminated or unsuitable material have different handling and disposal routes.
Excavations near buildings, boundaries or people may require support, barriers and controlled sequencing.
It should be stated clearly. Volume increases after soil is loosened, and tipping arrangements can be a major cost.
The method may need pumping, drainage or revised sequencing. Water conditions should be recorded and managed rather than buried.
Only where there is enough suitable space and an approved use for it without blocking access or damaging retained areas.
Good site preparation protects access, neighbours, existing property and the programme before the main construction work begins.
Explore site preparationDrainage work is about levels, capacity, access for maintenance and a lawful destination for water or waste.
Explore drainage groundworksFoundation work begins with the load, ground and nearby constraints, not with a standard trench depth copied from another property.
Explore foundationsRetaining, steps, paving and lawn preparation depend on coordinated levels and water movement.
Extension setting-out, foundations, drainage and finished floor levels begin in the ground.
Explain what the ground must support and any known access, level, drainage or excavation constraints.